12556-015.1 Missouri River WWTF Engine Generator Replacement And Digester System Improvements
A general description of the work is the removal and replacement of two (2) Gas Membrane Covers, installation of two (2) new waste gas burners and associated pipe support system, modifications to the existing boilers to convert fuel source from propane to natural gas, installation of a new natural gas service, new biogas pipeline, modifications to the existing digester gas piping, demolition of the existing generators, waste gas burner and propane system; and miscellaneous site improvements necessary to complete the work.
Bid Documents
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 12556-015.1 contract agreement | 230.0 KB | ||
| 12556-015.1 MO River WWTF - IFB Advertisement | 133.3 KB | ||
| 12556-015.1 MO River WWTF - IFB Bid Form | 614.5 KB | ||
| 12556-015.1 MO River WWTF - IFB Instructions to Bidders | 268.6 KB | ||
| 12556-015.1 Payment Bond | 216.6 KB | ||
| 12556-015.1 Performance Bond | 212.7 KB |
Plans
(click to expand/collapse)
(click to expand/collapse)
Prequalified Primes And Planholders
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 12556 Pre Qual Primes pdf | 172.2 KB |
Specs
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 12556-015.1 MO River WWTF - IFB Specs | 24.0 MB |
