Public Jobs

Bids due in 22 days
4/29/20 2:00 pm
11545-015.1 RE-BID Kayser Ave - Waller Ave. Storm Sewer
Metropolitan St Louis Sewer District
east of Lemay Ferry Road and south of River City Casino Blvd., in the City of unincorporated St. Louis Couty, Missouri.
construction of approximately 448 lineal feet of storm sewers, varying in size from 12" to 18" in diameter, and appurtenances.
Bids due in 21 days
4/28/20 2:00 pm
13183-015.1 St. Charles Rock Rd #9128 Storm Sewer (IR)
Metropolitan St Louis Sewer District
south of St. Charles Rock Road and east of Woodson Road, in the City of Breckenridge Hills, Missouri.
Construction of approximately 828 lineal feet of storm sewers, varying in size from 12 inch to 24 inch in diameter, and appurtenances.
COVID-19 Updates
Metropolitan St Louis Sewer District
Bids due in 9 days
4/16/20 2:00 pm
13232-015.1 Baden Cityshed Mitigation Basins (Calvary, Frederick, Partridge, and Tillie
Metropolitan St Louis Sewer District
Baden area of the City of St. Louis.
construction of four storm water detention basins.
Bids due in 7 days
4/14/20 3:00 pm
12104-015.1 Brookshire Sanitary Relief (Brookshire Dr to Cougar Dr)
Metropolitan St Louis Sewer District
north of Lindbergh Boulevard and west of New Halls Ferry Road, in the City of Florissant and unincorporated St. Louis County, Missouri.
construction of approximately 5,583 lineal feet of 8-inch to 18-inch diameter sanitary sewer and appurtenances.
12484-015.8 Mississippi Floodwall ORS Pump Stations Rehabilitation Phase II
Metropolitan St Louis Sewer District
Bidding Closed
3/18/20 10:00 am
13512 Woods Mill at L52 Pump Station Sanitary Replacement (IR) - IMMEDIATE NEEDS PROJECT
Metropolitan St Louis Sewer District
east of Highway 141 and north of Olive Boulevard, in the City of Maryland Heights, Missouri.
Construction of approximately 119 lineal feet of 10-inch diameter sanitary sewers, and appurtenances.
Bids due in 10 days
4/17/20 2:00 pm
11618-015.1 Whitney Pointe Dr. #2210 Channel Improvements
Metropolitan St Louis Sewer District
west of Missouri Route 340 (Clarkson Road) and north of Kehrs Mill Road, in the City of Clarkson Valley, Missouri.
Construction of approximately 275 lineal feet of natural channel stabilization, 23 lineal feet of pipe sewers 12" in diameter, and appurtenances.
Bids due in 7 days
4/14/20 2:00 pm
12112-015.1 Carson Villa, Rosary Lane and Thurston II Reduction
Metropolitan St Louis Sewer District
various sites, in the City of Bel-Nor, Bel-Ridge, Ferguson, Calverton Park, and unincorporated St. Louis County, Missouri.
construction of approximately 3,272 lineal feet of 12-inch to 30-inch diameter storm sewers and appurtenances, and the removal of private inflow sources from 71 private properties.
Bids due in 8 days
4/15/20 2:00 pm
12111-015.1 Capilia Sanitary Relief (Grant Rd to Capilia Dr)
Metropolitan St Louis Sewer District
located North of Gravois Road and west of Laclede Station Road, in the City of City of Crestwood and Grantwood Villiage, Missouri.
construction of approximately 2,771 lineal feet of sanitary sewer varying in size from 8-inches to 18-inches in diameter and appurtenances.