12556-015.1 Missouri River WWTF Engine Generator Replacement And Digester System Improvements
A general description of the work is the removal and replacement of two (2) Gas Membrane Covers, installation of two (2) new waste gas burners and associated pipe support system, modifications to the existing boilers to convert fuel source from propane to natural gas, installation of a new natural gas service, new biogas pipeline, modifications to the existing digester gas piping, demolition of the existing generators, waste gas burner and propane system; and miscellaneous site improvements necessary to complete the work.
Status
Accepting Bids
| Bid Date | 3/9/26 1:00pm |
