13227-015.1 RE-BID L51 Pump Station Forcemain Improvements

The work to be done under this contract consists of the construction of approximately 8,306 lineal feet of 36" forcemain, 26 linear feet of 2" Sport Port force main and connection to existing structure and appurtenances to be constructed.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
L51 PS FM_13227_REBID_Addend1_Contrctr Qs_06-23-25 (rev1) pdf 116.2 KB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
13227 ADD #2 2.2 MB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
L51 PS FM_13227_Addendum 3_07-10-25 156.3 KB