14093-015.1 Highland Village 206 Sanitary Sewer Relocation (IR)
The work to be done under this contract consists of the construction of approximately 237 lineal feet of 8-inch diameter pipe sewer, 43 lineal feet of steel casing pipe, 33 cubic yards of grade control channel, and appurtenances to be constructed.
Status
Accepting Bids
| Bid Date | 12/17/25 1:00pm |
Location
Located west of Highway 141 and south of Vance Road, in the City of Valley Park, Missouri.
