10883-015.1 St. Henry Bank Protection (Infrastructure Repair)

The work to be done under this contract consists of the construction of approximately 23 lineal feet of 18-inches in diameter pipe sewers, 53 cubic yards of grade control, 58 square yards of rock fill slope protection and appurtenances to be constructed.

Status

Accepting Bids

Bid Date 11/20/25 1:00pm

Company & Contacts

Metropolitan St Louis Sewer District
Damita Morris  

Location

Located north of St. Charles Rock Road and east of Interstate 170, in the City of Bel-Ridge, Missouri.