13740-015.1 LACKLAND STORM SEWER REPLACEMENT (IR)
The work to be done under this contract consists of the construction of approximately 126 lineal feet of pipe sewers 24” in diameter and appurtenances to be constructed.
Bid Documents
(click to expand/collapse)

Name | Size | ||
13740 Bid Form Contract Bond | 438.8 KB | ||
13740 NTC with MWBE | 508.3 KB | ||
13740 Public Notice | 75.6 KB |
Bid Summary, Bid Tab
(click to expand/collapse)

Name | Size | ||
13740 Bates Utility Company Bid Form | 4.9 MB | ||
13740 Bid Tab FINAL without Est | 108.2 KB | ||
13740 Final Bid Summary | 617.9 KB | ||
13740 Gershenson Construction bid form | 7.1 MB | ||
13740 Girdner Contracting BID FORM | 481.7 KB | ||
Notice of Award | 612.7 KB |
Plans
(click to expand/collapse)

Name | Size | |||
13740-[C1-P1]_Lackland Storm (IR) Final Plans 1 | 151.6 KB | |||
13740-[C1-P1]_Lackland Storm (IR) Final Plans 2 | 245.1 KB |
Prequalified Primes And Planholders
(click to expand/collapse)

Name | Size | ||
13740 Pre Qual Primes | 135.4 KB |
Specs
(click to expand/collapse)

Name | Size | ||
13740 Complete Specs Bid Pkg | 8.0 MB |