10715-015.1 New England Town Cliff Cave Pump Station (P-323) Improvements
The work to be done under this contract consists of the construction of approximately 3,253 lineal feet of pipe sewers, varying in size from 8 " to12 " in diameter, 1,772 lineal feet of 6” force main, one sanitary pump station to be constructed.
Status
Accepting Bids
Bid Date | 1/22/25 1:00pm |
Location
Located south of the intersection of Bussed Rd. and Cliff Cave Road along Cliff Cave Road to a point approximately 2,000 feet south and along Hempline Court for approximately 700 feet from the intersection of Glenrich Drive, in unincorporated STL Co, MO