13033-015.1 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023) CONTRACT C

Contract consists of the rehabilitation of approximately 38,363 lineal feet of sewers, varying in size from 8-inches to 36-inches in diameter, utilizing cured-in-place-pipe (CIPP) methods, 28 manholes, 756 service connections, and 4 point repairs to be constructed

Status

Accepting Bids

Bid Date8/16/22 2:00pm

Company & Contacts

Metropolitan St Louis Sewer District

Elizabeth Goetz,egoetz@stlmsd.com  

Location

Located various sites, in the City of Florissant, Missouri