13596-015.1 Lemay 1 Pump Station (P-301) Cooling Tower Replacement

Status

Accepting Bids

Bid Date8/9/22 2:00pm

Company & Contacts

Metropolitan St Louis Sewer District

Stacey Hunter, shunter@stlmsd.com  

A general description of the work to be done under these contract documents is described as
follows.
· Demolition and removal of three (3) existing cooling tower units.
· Provide and install four (4) new cooling tower units, including piping, valving, and
supports, as described in the contract documents.
· Expansion of the existing concrete foundation pad, as described in the contract
documents.
· Electrical and control work associated with the cooling tower units, as described in the
contract documents.