12248-015.1 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS

Demolition of existing building, demolition of equipment located in pump station dry pit, conversion of dry pit to a wet well for submersible pumps, installation of submersible pumps, construction of interior concrete walls, installation of piping, construction of junction box, construction of a valve vault, installation of a electrical building, site work, installation of a vapor phase odor control system and liquid phase odor control system.

Status

Accepting Bids

Bid Date11/3/21 2:00pm

Company & Contacts

Metropolitan St Louis Sewer District

Elizabeth Goetz, egoetz@stlmsd.com