11984-015.1 University City II Reduction - East (UR-08 and UR-09)

construction of approximately 6,270 lineal feet of storm and sanitary sewers varying in size from 10-inches to 42-inches in diameter, and the removal of inflow sources from 221 properties.
  Bid Documents (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download to registered users. Log in now
Name Size
11984 Bid Form C Contract Bonds 211.6 KB
11984 NTC with MWBE 559.5 KB
11984 Public Notice 9.2 KB
  Bid Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download to registered users. Log in now
Name Size
11984 Specs 46.4 MB
  Prequalified Primes And Planholders (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2018-19 Approved Contractor List 1.29.19 73.3 KB