12828-015.1 Bissell Point WWTF Redundant Sludge Acceptance System

The Work of this Contract is generally described as demolition of: existing polymer storage tanks and associated piping, cast-in-place reinforced concrete wall, pavement, mechanical equipment, piping, duct banks, electrical, generator, instrumentation and control wiring, and associated site features. New facilities include: cast-in-place concrete structure; sole-source Schwing Bioset equipment consisting of sludge hopper and hatch, hydraulic power unit, biosolids pump, twin screw feeder, and push floor dischargers; hoist; sump pump; buried and exposed interior piping; valves; motor control center; electrical facilities and wiring; instrumentation and control equipment; HVAC equipment; and site work including excavation, backfill, finish grading, paving, and seeding.
  Bid Summary Bid Tab (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
12828 Bid Summary WITH Totals 23.1 KB
12828 Bid Tab NO Estimate 33.4 KB
notice of award 856.2 KB